Skip to main content
One-Time Electric Pay One-Time Electric Pay
Propane Center Propane Center
Outage Center Outage Center
Home

24/7   800-421-0283

Menu

Latest

  • COVID-19: Lobbies closed but phone lines, website and drive-thru open! Power On!  
  • Wednesday 1/27 - Full Load Control today at 5 p.m.  Participating loads will be affected.  More Details.
1 of 2 
  • My Electric Account
    • Capital Credits
    • New Construction or Rebuild
    • Outage Notification
    • Overhead to Underground Conversion
    • Payment Options
    • Rates, Fees and Deposits
    • Security Lights
    • SmartHub Overview & Enrollment
    • Start or Stop Service
    • Understanding Your Bill
    • Update Your Contact Information
  • Energy Savers & Solutions
    • Beat the Peak
    • Do the Summer Shift
    • Electric Grid & Meter Upgrade
    • E-Vehicle Charger
    • ETS Unit
    • Energy Saver Videos
    • How to Spot a High Bill with SmartHub
    • Load Management
    • Lower Your Energy Bill
    • Mini Boiler
    • Off-Peak
    • Rebates
    • Stray Voltage
    • Use Energy Wisely Guide & 101 Ways to Save
    • Water Heater
  • Community
    • Co-op Scholarships
    • Diggers Hotline
    • Economic Development
    • Electric Safety
    • Gift Cards
    • Kids Activity Page
    • License to Live Drivers Safety
    • Operation Round Up
    • Power Line Safety Demo
    • Youth Tour
  • My Co-op
    • 2020 Annual Meeting Report
    • About Us
    • Audit and Bylaws
    • Board of Directors
    • Co-op History & Timeline
    • Employment Opportunities
    • General Manager Blog
    • Legal & Privacy Statements
    • Mission, Values, Principles
    • Newsletter
    • Polk-Burnett Policies
    • Right-of-Way Program
  • Go Green
    • E-Vehicles
    • Energy Supply & Renewables
    • Evergreen 100% Green Facility
    • Evergreen Renewable Energy Blocks
    • Geothermal Energy
    • Home Solar and Wind
    • Paperless Billing
    • Protect the Karner Blue Butterfly
    • SunTuria Solar Tours
    • SunTuria Solar

Non-Commercial Single-Phase Rates

Service requirements and fees are subject to change at any time.

Polk-Burnett will furnish, install, own, and maintain the electric distribution system to the metering point for the following fees:

  • Installation charge .......................................................................................................................................................................... $450
  • Line Extension fee - per foot .....................................................................................................................$5.50/ft
  • Double run of secondary wire (additional fee per foot) ............................................................................ $2.00/ft
  • Installation of secondary wire in conduit (if necessary - additional per foot) ............................................ $1.00/ft
  • Construction service (Polk-Burnett-provided - 12 month limit to make service permanent) ........................................................... $400
  • Construction service (Member-provided - 12 month limit to make service permanent) .................................................................. $300
  • Extra trip charge for service not being ready or not prepared to Polk-Burnett or code requirements (per trip ).............................. $200
  • Extra trip charge to stub secondary wire to foundation of building for future socket to avoid frost charges ................................... $200

Additional Fees

  • If a new service is connected to an existing installed line of less than five years of age, the new member may be required to pay a share
    of the initial cost of installing the original line.
  • In addition to normal line extension rates, any fees such as local permits charged to Polk-Burnett for extending and constructing the
    electric service to a new location will be passed on to the member requesting the service.
  • There will be an additional charge for boring under obstructions (i.e. roads, driveways, waterways) for underground installations.
  • Services to signs, traffic lighting, and storage rental units may incur additional charges dependent upon construction requirements.

Winter Conditions: For underground service performed during winter conditions, the following additional charges and requirements will apply:

  • There is an additional charge of $8 per foot when winter conditions exist that impede installation.
  • There also may be an additional labor and/or equipment charges associated with digging lines to equipment that is required due to frost,
    such as transformers, enclosures, or the meter socket.
  • Other options are available such as a temporary overhead installation.

Line extensions are scheduled on a first-come, first-served basis, once payment has been made and all other service requirements have been 
met. For emergency requests of installation of electric service, there will be a three business-day minimum wait for locating underground utilities
through Digger’s Hotline.

Security Light Installation

Fees and requirements are subject to change at any time.
  • Installation of a security light on an existing low-voltage Polk-Burnett pole.......................................................................... no charge
  • Installation of a security light requiring overhead or underground service and installation of a new pole............................$450 pole setting fee
    plus $3 per foot from Polk-Burnett power source (as determined by Polk-Burnett) to the new security light location. Polk-Burnett owns and maintains the pole.
  • Request to change a security light location and/or direction (after initial installation)............................................................actual cost

 

Back to Top

Bottom Menu

  • Legal & Privacy Policy
  • Employment Opportunities
  • Facebook
  • Twitter
  • YouTube

©2021 Polk-Burnett Electric Cooperative. Your Source for Reliable Power

  • My Electric Account
    • Capital Credits
    • New Construction or Rebuild
    • Outage Notification
    • Overhead to Underground Conversion
    • Payment Options
    • Rates, Fees and Deposits
    • Security Lights
    • SmartHub Overview & Enrollment
    • Start or Stop Service
    • Understanding Your Bill
    • Update Your Contact Information
  • Energy Savers & Solutions
    • Beat the Peak
    • Do the Summer Shift
    • Electric Grid & Meter Upgrade
    • E-Vehicle Charger
    • ETS Unit
    • Energy Saver Videos
    • How to Spot a High Bill with SmartHub
    • Load Management
    • Lower Your Energy Bill
    • Mini Boiler
    • Off-Peak
    • Rebates
    • Stray Voltage
    • Use Energy Wisely Guide & 101 Ways to Save
    • Water Heater
  • Community
    • Co-op Scholarships
    • Diggers Hotline
    • Economic Development
    • Electric Safety
    • Gift Cards
    • Kids Activity Page
    • License to Live Drivers Safety
    • Operation Round Up
    • Power Line Safety Demo
    • Youth Tour
  • My Co-op
    • 2020 Annual Meeting Report
    • About Us
    • Audit and Bylaws
    • Board of Directors
    • Co-op History & Timeline
    • Employment Opportunities
    • General Manager Blog
    • Legal & Privacy Statements
    • Mission, Values, Principles
    • Newsletter
    • Polk-Burnett Policies
    • Right-of-Way Program
  • Go Green
    • E-Vehicles
    • Energy Supply & Renewables
    • Evergreen 100% Green Facility
    • Evergreen Renewable Energy Blocks
    • Geothermal Energy
    • Home Solar and Wind
    • Paperless Billing
    • Protect the Karner Blue Butterfly
    • SunTuria Solar Tours
    • SunTuria Solar